Thursday, October 15, 2020

Miller Road - 10/15/2020



Re-routing the ditch line to get storm water into our new storm pipe on Miller Road.


Spreading seed on the east side of Miller Road.


Ditch line re-routed for stormwater.


Street sweeping. Cleaning up the project as it is the last day until they come back in Spring.



Wednesday, October 14, 2020

Miller Road - 10/14/2020



Dirtwork/grading on the east side of Miller Road.


Hauling off all the excess dirt.


Concrete pour on Lester Street where we installed new storm pipe and connected to existing water main.


View of new storm pipe beneath Lester Street.


Haling off more excess dirt on Miller Road.


Tuesday, October 13, 2020

Miller Road - 10/13/2020



Digging trench for storm pipe on Miller Road.


Lowering new storm pipe into the ground.


Getting our depth and angle right. Connecting the sections beneath the driveway.


Storm pipe install nearly complete. Will add the flared end section then backfill driveway with clean rock.



Monday, October 12, 2020

Miller Road - 10/12/2020



Installing 18” RCP storm pipe on the north end of Miller Road.


Install complete. Getting driveway backfilled woth clean rock.


Driveway backfilled and accessible.


Crew digging up Lester Street to get another section of new storm pipe in.



Thursday, October 8, 2020

Miller Road - 10/8/2020



Digging up service line for Sonic.


Prepping service connection for Casey’s.


Connection complete for Sonic.


Installing the meter setter for Casey’s.


Casey’s connection complete.


Working on Mercy service connection.


Mercy connection complete.



Wednesday, October 7, 2020

Miller Road - 10/7/2020



Digging up existing main to shut off the service line that we will be connecting to.


Getting an existing service line connected to our new service coming off the new main.


New service connection to an existing service line running across Miller Road.


Another new service connection made. Using existing meter pit rather than a new one.


Backfilling connection with clean rock.


Another new connection made and new meter pit being installed.



Tuesday, October 6, 2020

Miller Road - 10/6/2020



Continuing to lay new storm pipe on front of Casey’s on Miller Road.


Dug out the trench to the desired depth.


Lowering another section of storm pipe into the trench.


Backfilling the trench with clean rock before leaving for the day.



Miller Road - 10/5/2020



Installing 18” RCP storm pipe in front of Casey’s on Miller Road.


Connected to existing storm manhole on the corner.


Have to work around a gas main. Will dig deeper and lay gas main beneath our storm pipe as it crosses.


Lowering new storm pipe into the trench.


Backfilling with clean rock before leaving for the day.


Friday, October 2, 2020

Miller Road - 10/2/2020



Storm pipe install completed at STA 6+00 on east side of Miller Road.


Storm pipe install completed at STA 5+00 on east side of Miller Road.


Crew cleaned up the area on Walnut Street where we were tapped in to pressure test and pump in the chlorine for cleaning.


Concrete pour on Walnut Street to get the roadway opened back up.


Smoothing out the surface.