Getting the edge of asphalt dug out for the widening of Miller Road.
Base rock being put down as they go.
A look from Jackson Street intersection to the south.
A look at the yard where everything is being stored.
Discussed this corner with engineer and contractor. Sign relocation and extending the storm pipe.
No comments:
Post a Comment