Monday, June 7, 2021

Miller Road - 6/7/2021



Digging out our last piece on Miller Road.


Forming up the sidewalk down at the insurance lot.


Compacting rock.


Base is being put in and compacted.


Digging out to replace the concrete flume.


Asphalt going down on Miller.


Concrete pour started for the flume.


Concrete pour for the new sidewalk at the insurance lot.




Flume replaced.


Rock being compacted. Fixing a spot near the lot that was damaged due to our equipment continuously running over it.


Asphalt patch in alley near equipment lot.