Showing posts with label 8-17-2020. Show all posts
Showing posts with label 8-17-2020. Show all posts

Monday, August 17, 2020

Miller Road Improvements, 8-17-2020

Arrived on site at 1:48 pm.


Installed area inlet lid.


Installed most of trench drain on Storm J line.




Departed site at 2:58 pm.