3811 Miller Road Improvements
Showing posts with label
8-17-2020
.
Show all posts
Showing posts with label
8-17-2020
.
Show all posts
Monday, August 17, 2020
Miller Road Improvements, 8-17-2020
Arrived on site at 1:48 pm.
Installed area inlet lid.
Installed most of trench drain on Storm J line.
Departed site at 2:58 pm.
Older Posts
Home
Subscribe to:
Posts (Atom)