Showing posts with label 9-25-2020. Show all posts
Showing posts with label 9-25-2020. Show all posts

Friday, September 25, 2020

Miller Road Improvements, 9-25-2020

Arrived on site at 11:20 am.


Installed waterline along south side of Walnut Lane.






Departed site at 11:50 am.